home
services
why choose us
case study
the guild
contact us
Case Study: stage 3
The existing sole plate was completely rotten and needed replacing. New foundations were layed to incorporate brickwork and the new sole plate.
jump to: previous page | next page
Copyright © 2012 | Period Building Restoration Limited | Site design by Gregory Gray Graphic Design